Function: Material Finishing and Handling
Features: Construction of the 18,400 sq. ft. addition took place without disrupting Tufts Grinding’s production schedule. A fire sprinkler system was installed in the new building including a retro-fit into the existing building to meet current fire codes. A 7-1/2 ton
capacity, heavy duty, double girder, top running crane with a 95 ft span was installed. Special structural engineering was used to create a large clear span opening into the existing building.
Square Footage: 18,400 sq. ft.