New Covenant Church

  • Church Renovation
  • Removal of wing walls at each side of stage to increase viewing angles and add more room to stage. This included re-supporting the existing drywall arch over the stage.
  • Removal of dated pulpits.
  • Added stage lighting.
  • Installation of oak hardwood flooring.
  • New stage face with decorative moldings implemented.
  • Added two new stairways at both sides of the stage and added a removable center aisle stair.

Category